Design Alternative 2 includes on-street bike lanes and off-street multiuse (cyclist and pedestrian) paths. The cross sections varies depending on the section of street.
Cross section: 205th Avenue between SW Baseline Road and SW Gracie Street
There is already 70-92 feet of right-of-way; the proposed cross section is 78 feet.
- 10-foot multiuse paths on both sides of the street
- 4.5-foot landscape strips between the paths and street on both sides of the street
- 6-foot bike lanes on both sides of the street
- 12-foot vehicle lanes, one in each direction
- 14-foot center turn lane
Cross section: 205th Avenue between bridge over Beaverton Creek
There is already 40 feet of right-of-way; the proposed cross section is 92-135 feet.
- 8.5-foot sidewalks on both sides of the street
- 7-foot bike lanes on both sides of the street
- 4-foot painted buffers between bike lane and vehicle lane
- 12-foot vehicle lanes, one in each direction
- 16-foot center median
Cross section: 205th Avenue between the bridge and Quatama Street
There is already 98 feet of right-of-way; the proposed cross section is 92-135 feet.
- 8.5-foot sidewalks on both sides of the street
- 7 foot-bike lanes on both sides of the street
- 4-foot painted buffers between bike lanes and vehicle lanes
- 12-foot vehicle lanes, one in each direction
- 14-foot center turn lane